What was found
DURING ACCOMPLISHMENT OF CPCP TASK C53-107-01, FRAME SECTION AT BS 887, RBL 65 WHERE IT PASSES THROUGH FLOOR STRUCTURE, WAS FOUND TO HAVE CORROSION BEYOND SRM LIMITS. DAMAGE WAS REPAIRED PER SRM 51-40-3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ACCOMPLISHMENT OF CPCP TASK C53-107-01, FRAME SECTION AT BS 887, RBL 65 WHERE IT PASSES THROUGH FLOOR STRUCTURE, WAS FOUND TO HAVE CORROSION BEYOND SRM LIMITS. DAMAGE WAS REPAIRED PER SRM 51-40-3.