What was found
DURING SCHEDULED TERMINAL CHECK, FOUND CRACK IN PRIOR REPAIR AT BS 722 BLEND TO CEILING ANGLE. REPAIRED PER BOEING MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED TERMINAL CHECK, FOUND CRACK IN PRIOR REPAIR AT BS 722 BLEND TO CEILING ANGLE. REPAIRED PER BOEING MM.