What was found
DURING SCHEDULED D-CHECK, FOUND 2 FRAMES CRACKED, BS 482A, WL 153 RT, AND BS 440 BETWEEN STRINGERS 8L-9L. REPAIRED FRAMES PER SRM AND ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 2 FRAMES CRACKED, BS 482A, WL 153 RT, AND BS 440 BETWEEN STRINGERS 8L-9L. REPAIRED FRAMES PER SRM AND ER.