What was found
DURING SCHEDULED D CHECK, FOUND BS 986 FLOORBEAM UPPER SURFACE CORRODED, LBL 53-RBL 53. REPAIRED BEAM PER ER NR OO-0212 AND SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND BS 986 FLOORBEAM UPPER SURFACE CORRODED, LBL 53-RBL 53. REPAIRED BEAM PER ER NR OO-0212 AND SRM.