What was found
DURING SCHEDULED D CHECK, FOUND FLOORBEAMS UPPER SURFACE CORRODED, BS 947, LBL 5 TO RBL 55, AND BS 887, RBL 21 TO LBL 62. REPAIRED FLOORBEAMS PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FLOORBEAMS UPPER SURFACE CORRODED, BS 947, LBL 5 TO RBL 55, AND BS 887, RBL 21 TO LBL 62. REPAIRED FLOORBEAMS PER SRM.