What was found
DURING SCHEDULED C1 CHECK, FOUND EEPLS TRACK COVERS CRACKED AT ROWS 2 AND 15. REMOVED AND REPLACED FLOOR TRACK COVERS PER MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C1 CHECK, FOUND EEPLS TRACK COVERS CRACKED AT ROWS 2 AND 15. REMOVED AND REPLACED FLOOR TRACK COVERS PER MM.