What was found
DURING SCHEDULED 1/2D CHECK, FOUND SHEAR TIE CRACKED, BS 400, BETWEEN STRINGERS 15R - 16R. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND SHEAR TIE CRACKED, BS 400, BETWEEN STRINGERS 15R - 16R. REPAIRED SHEAR TIE PER SRM.