What was found
DURING SCHEDULED 1/2D CHECK, FOUND BS 727 BULKHEAD VERTICAL BEAM UPPER FITTING CRACKED. REMOVED AND REPLACED FITTING PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND BS 727 BULKHEAD VERTICAL BEAM UPPER FITTING CRACKED. REMOVED AND REPLACED FITTING PER SRM.