What was found
DURING SCHEDULED 1/2D CHECK, FOUND CREASE BEAM CORRODED, BS 827 TO BS 847. REPAIRED CREASE BEAM SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CREASE BEAM CORRODED, BS 827 TO BS 847. REPAIRED CREASE BEAM SECTION PER SRM.