What was found
DURING SCHEDULED D-CHECK, FOUND BS 986 FLOORBEAM UPPER SURFACE CORRODED, LBL 45 TO RBL 45. REPAIRED FLOORBEAM PER TI-453-037.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND BS 986 FLOORBEAM UPPER SURFACE CORRODED, LBL 45 TO RBL 45. REPAIRED FLOORBEAM PER TI-453-037.