What was found
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE CRACKED AT BS 400, STR 13R - 14 R. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE CRACKED AT BS 400, STR 13R - 14 R. REPAIRED SHEAR TIE PER SRM.