What was found
DURING SCHEDULED D-CHECK, FOUND FRAME CORRODED AT BS 827, STR 27R - 27L. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FRAME CORRODED AT BS 827, STR 27R - 27L. REPAIRED FRAME PER SRM.