What was found
DURING SCHEDULED D CHECK, FOUND FLOOR BEAM CORRODED, BS 328, RBL 5 TO LBL 40. REPAIRED FLOOR BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FLOOR BEAM CORRODED, BS 328, RBL 5 TO LBL 40. REPAIRED FLOOR BEAM PER SRM.