What was found
DURING SCHEDULED D-CHECK, FOUND 2 FUSELAGE FRAME CRACKS BS 440, RBL 37, WL 158 & WL 160. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND 2 FUSELAGE FRAME CRACKS BS 440, RBL 37, WL 158 & WL 160. REPAIRED FRAME PER SRM.