What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME SHEAR TIE CORRODED AT BS 520, BETWEEN STR 28R & 28L. REMOVED AND REPLACED FRAME SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME SHEAR TIE CORRODED AT BS 520, BETWEEN STR 28R & 28L. REMOVED AND REPLACED FRAME SHEAR TIE PER SRM.