What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAMES CRACKED AT BS 440, STR 9R AND BS 400, BETWEEN STR 8L & 9L. REPAIRED FRAMES PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAMES CRACKED AT BS 440, STR 9R AND BS 400, BETWEEN STR 8L & 9L. REPAIRED FRAMES PER SRM.