What was found
DURING SCHEDULED 1/4D CHECK, FOUND VERTICAL STIFFENER CRACKED IN MAIN WHEEL WELL BULKHEAD BS 663, RBL 615. REPAIRED STIFFENER PER SWA RA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND VERTICAL STIFFENER CRACKED IN MAIN WHEEL WELL BULKHEAD BS 663, RBL 615. REPAIRED STIFFENER PER SWA RA.