What was found
DURING SCHEDULED D CHECK, FOUND RH MLG BEAM FITTING CRACKED AT D HOLE. REPAIRED FITTING PER BFG ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND RH MLG BEAM FITTING CRACKED AT D HOLE. REPAIRED FITTING PER BFG ER.