What was found
DURING SCHEDULED D CHECK, FOUND RH MLG STABILIZER BEAM CORRODED AT AFT INBD SIDE. R&R STAB BEAM PER MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND RH MLG STABILIZER BEAM CORRODED AT AFT INBD SIDE. R&R STAB BEAM PER MM.