What was found
DURING SCHEDULED 1/2D CHECK AT DALFORT, FOUND FLOOR BEAM CRACKED AT BS 744A, RBL 43.5. REPAIRED FLOOR BEAM PER DLF XEA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK AT DALFORT, FOUND FLOOR BEAM CRACKED AT BS 744A, RBL 43.5. REPAIRED FLOOR BEAM PER DLF XEA.