What was found
DURING SCHEDULED 1/4D CHECK, FOUND SHEAR TIE FRAME CORRODED AT BS 747, BETWEEN STR 26R & 27R. REPAIRED SHEAR TIE FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND SHEAR TIE FRAME CORRODED AT BS 747, BETWEEN STR 26R & 27R. REPAIRED SHEAR TIE FRAME PER SRM.