What was found
DURING SCHEDULED D-CHECK, FOUND STR SPLICE'S CRACKED (2 EA) AT BS 908, STR 4L & 4R. REMOVED AND REPLACED STR SPLICE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND STR SPLICE'S CRACKED (2 EA) AT BS 908, STR 4L & 4R. REMOVED AND REPLACED STR SPLICE PER SRM.