What was found
DURING SCHEDULED 1/4D CHECK, FOUND BS 860 AND BS 859, LBL 3, LONGITUDINAL BEAM CORRODED AT NUT PLATE HOLES. REPAIRED FLOORBEAM PER SWA RA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND BS 860 AND BS 859, LBL 3, LONGITUDINAL BEAM CORRODED AT NUT PLATE HOLES. REPAIRED FLOORBEAM PER SWA RA.