What was found
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME CRACKED AT 2 EA PLACES, BS 616, LBL65 AND RBL 65, WL 200. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME CRACKED AT 2 EA PLACES, BS 616, LBL65 AND RBL 65, WL 200. REPAIRED FRAME PER SRM.