What was found
DURING SCHEDULED 1/2D CHECK, FOUND BELTFRAME SHEAR TIE CORRODED, BS 842, BETWEEN STRINGER 28L AND 28R. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND BELTFRAME SHEAR TIE CORRODED, BS 842, BETWEEN STRINGER 28L AND 28R. REPAIRED SHEAR TIE PER SRM.