What was found
DURING SCHEDULED 1/4D CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 500B, BETWEEN STR 19L AND 20L. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 500B, BETWEEN STR 19L AND 20L. REPAIRED FRAME PER SRM.