What was found
DURING SCHEDULED D CHECK, FOUND FLOORBEAM CORRODED AT BS 328, RBL 24 TO RBL 54. REPAIRED FLOORBEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FLOORBEAM CORRODED AT BS 328, RBL 24 TO RBL 54. REPAIRED FLOORBEAM PER SRM.