What was found
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM CORRODED AT BS 328, WL 208 & LBL 28 AND BS 344, WL 208 & LBL 8. REPAIRED FLOORBEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM CORRODED AT BS 328, WL 208 & LBL 28 AND BS 344, WL 208 & LBL 8. REPAIRED FLOORBEAM PER SRM.