What was found
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE CORRODED AT BS 480, WL 148, RBL 4 TO LBL 4. REPAIRED SHEAR TIE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND SHEAR TIE CORRODED AT BS 480, WL 148, RBL 4 TO LBL 4. REPAIRED SHEAR TIE PER SRM.