What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAMES CRACKED (2 EA) AT BS 360, BETWEEN STR 7R AND STR 8R AND AT BS 400, BETWEEN STR 8L AND STR 9L. REPAIRED FRAMES PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAMES CRACKED (2 EA) AT BS 360, BETWEEN STR 7R AND STR 8R AND AT BS 400, BETWEEN STR 8L AND STR 9L. REPAIRED FRAMES PER SRM.