What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 500C, BETWEEN STR 27R & STR 28R. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 500C, BETWEEN STR 27R & STR 28R. REPAIRED FRAME PER SRM.