What was found
DURING SCHEDULED 1/2D CHECK, FOUND CREASE BEAM CORRODED FROM BS 390 TO BS 500C + 17, RT SIDE. REPAIRED CREASE BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CREASE BEAM CORRODED FROM BS 390 TO BS 500C + 17, RT SIDE. REPAIRED CREASE BEAM PER SRM.