What was found
DURING SCHEDULED 1/4D CHECK, FOUND FWD ENTRY DOOR CRACKED AT AFT FRAME ON 5TH FROM TOP STOP PIN CUTOUT. REPAIRED FRAME PER SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND FWD ENTRY DOOR CRACKED AT AFT FRAME ON 5TH FROM TOP STOP PIN CUTOUT. REPAIRED FRAME PER SWA EA.