What was found
DURING SCHEDULED 1/4D CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 947, STR 23L TO STR 24L. REMOVED AND REPLACED SHEAR TIE SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND FUSELAGE SHEAR TIE CORRODED AT BS 947, STR 23L TO STR 24L. REMOVED AND REPLACED SHEAR TIE SECTION PER SRM.