What was found
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 380, LBL 20. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 380, LBL 20. REPAIRED FRAME PER SRM.