What was found
DURING SCHEDULED D-CHECK, FOUND CORROSION BS 294, RBL 33 TO 53, FLOORBEAM. REPAIRED FLOORBEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND CORROSION BS 294, RBL 33 TO 53, FLOORBEAM. REPAIRED FLOORBEAM PER SRM.