What was found
DURING SCHEDULED D CHECK, FOUND CREASE BEAM SPLICE CORRODED AT BS 290, RBL 53. REMOVED AND REPLACED CREASE BEAM SPLICE SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND CREASE BEAM SPLICE CORRODED AT BS 290, RBL 53. REMOVED AND REPLACED CREASE BEAM SPLICE SECTION PER SRM.