What was found
DURING SCHEDULED D CHECK, FOUND FLOORBEAM CORRODED AT BS 986.5, RBL 44, WL 208, BS 986.5, LBL 12, WL 208, BS 986.5, LBL 13.5, BS 986, LBL 14, WL 209, BS 986, LBL 44, WL 209, BS 986.5 LBL 16, WL 210, BS 947.5, RBL 11, WL 208, BS 947.5, RBL 15 WL 208, BS 947, RBL 8, WL 208. REPAIRED FLOORBEAM PER SRM.