What was found
DURING SCHEDULED D CHECK, FOUND CREASE BEAM CORRODED AT BS 380 TO BS 400 LT, WL 208 AND BS 500 TO 500A LT, WL 208. REPAIRED CREASE BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND CREASE BEAM CORRODED AT BS 380 TO BS 400 LT, WL 208 AND BS 500 TO 500A LT, WL 208. REPAIRED CREASE BEAM PER SRM.