What was found
DURING SCHEDULED 1/2D CHECK, FOUND CREASE BEAMS CORRODED AT BS 300 TO BS 328 RT AND BS 400 TO BS 420 LT. REPAIRED CREASE BEAMS PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND CREASE BEAMS CORRODED AT BS 300 TO BS 328 RT AND BS 400 TO BS 420 LT. REPAIRED CREASE BEAMS PER SRM.