What was found
DURING SCHEDULED 1/2D CHECK, FOUND FRAME CORRODED AT BS 787, STRINGER 25R. REPAIRED FRAME PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FRAME CORRODED AT BS 787, STRINGER 25R. REPAIRED FRAME PER SRM.