What was found
DURING SCHEDULED D CHECK, FOUND R1 DOOR CUTOUT SUBFRAME CRACKED AT BS 303, RBL 56, WL 208. REMOVED AND REPLACED SUBFRAME SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND R1 DOOR CUTOUT SUBFRAME CRACKED AT BS 303, RBL 56, WL 208. REMOVED AND REPLACED SUBFRAME SECTION PER SRM.