What was found
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM UPPER SURFACES CORRODED AT BS 344, LBL 10 TO LBL 65, BS 328, RBL 15 TO RBL 50, AND BS 312, LBL 8 TO RBL 49. REPAIRED FLOORBEAMS PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM UPPER SURFACES CORRODED AT BS 344, LBL 10 TO LBL 65, BS 328, RBL 15 TO RBL 50, AND BS 312, LBL 8 TO RBL 49. REPAIRED FLOORBEAMS PER SRM.