What was found
DURING SCHEDULED D-CHECK, FOUND STRINGER SPLICE CRACKED A BS 907, STRINGER 4R. REMOVED AND REPLACED STRINGER SPLICE PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND STRINGER SPLICE CRACKED A BS 907, STRINGER 4R. REMOVED AND REPLACED STRINGER SPLICE PER SRM.