What was found
DURING SCHEDULED D CHECK, FOUND CREASE BEAM AT BS 960 TO BS 986, LBL 60 TO LBL 65, WL 208, CORRODED. REPAIRED CREASE BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND CREASE BEAM AT BS 960 TO BS 986, LBL 60 TO LBL 65, WL 208, CORRODED. REPAIRED CREASE BEAM PER SRM.