What was found
DURING SCHEDULED D-CHECK, FOUND LT MLG BEAM FITTING AT D-HOLE CRACKED. REMOVED AND REPLACED LT MLG FITTING PER ER.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND LT MLG BEAM FITTING AT D-HOLE CRACKED. REMOVED AND REPLACED LT MLG FITTING PER ER.