What was found
DURING SCHEDULED D CHECK, FOUND BULKHEAD AT BS 727, RT AND LT KEEL BEAM VERTICAL STIFFENERS CRACKED. REMOVED AND REPLACED VERTICAL STIFFENERS PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND BULKHEAD AT BS 727, RT AND LT KEEL BEAM VERTICAL STIFFENERS CRACKED. REMOVED AND REPLACED VERTICAL STIFFENERS PER SRM.