What was found
DURING SCHEDULED 1/2D CHECK, FOUND LT CREASE BEAM AT BS 957 TO BS 986, CORRODED. REMOVED AND REPLACED BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND LT CREASE BEAM AT BS 957 TO BS 986, CORRODED. REMOVED AND REPLACED BEAM PER SRM.