What was found
DURING SCHEDULED D CHECK, FOUND VERTICAL STAB T/E BEAM AT LT RUDDER STATION 13.3 TO RUDDER STATION 121.64, CRACKED. REMOVED AND REPLACED VERTICAL STAB BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND VERTICAL STAB T/E BEAM AT LT RUDDER STATION 13.3 TO RUDDER STATION 121.64, CRACKED. REMOVED AND REPLACED VERTICAL STAB BEAM PER SRM.