What was found
DURING SCHEDULED D-CHECK, FOUND CREASE BEAM WEB AT BS 946, STRINGER 17R, CORRODED. REMOVED AND REPLACED CREASE BEAM WEB SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND CREASE BEAM WEB AT BS 946, STRINGER 17R, CORRODED. REMOVED AND REPLACED CREASE BEAM WEB SECTION PER SRM.